Skip to content

UPDATE: Highway 97 construction in McLeese Lake extended

Utility work is expected to be complete on March 7
am-mcleese-lake
Highway 97 is reduced to a single lane with alternating traffic in McLeese Lake until March 28, 2025.

Highway 97 is reduced to one lane between Robertson Road and Beaver Lake Road in McLeese Lake for utility work.  

Traffic will be directed to alternate until March 28 at 4 p.m., and drivers are asked to watch for signs and personnel.  

Original: 

 

Highway 97 is reduced to one lane between Robertson Road and Beaver Lake Road in McLeese Lake for utility work.  

Traffic will be directed to alternate until March 7 at 4 p.m., and drivers are asked to watch for signs and personnel.  



Andie Mollins, Local Journalism Initiative

About the Author: Andie Mollins, Local Journalism Initiative

Born and raised in Southeast N.B., I spent my childhood building snow forts at my cousins' and sandcastles at the beach.
Read more